Posted Aug 22 2010 @ 12:00am
Trains run every 24 minutes between Broadway Junction and Rockaway Pkwy
Weekend, 7 AM to 7 PM, Sunday, Aug 22
Please allow additional travel time.
Trains run in two sections:
1. Between 8 Av and Broadway Junction
2. Between Broadway Junction and Rockaway Pkwy
Transfer at Broadway Junction to continue your trip.
Trains run every 8 minutes between 8 Av and Broadway Junction.
Trains run every 24 minutes between Broadway Junction and Rockaway Pkwy.
The sign in button below is safe and secure.
Send a private note by email and/or mobile phone:
Don't forget to include your contact information if you wish to receive
a response from the poster.
Send to your friends:
Keep them in the loop about this alert and send them an email.
Report Alert as: Inaccurate | Miscategorized | Inappropriate | Spam/Over Post